Project brief
Define outcomes, constraints, location, and the decisions the project must resolve.
Clear guidance from the first project brief and budget to materials, construction, and handover.
Define outcomes, constraints, location, and the decisions the project must resolve.
Test scope against approvals, site conditions, budget, and programme.
Coordinate drawings, procurement, sequencing, quality, and change control.
Close inspections, records, commissioning, warranties, and owner training.
What design-build means, who the architect works for, what drives its cost, when the price becomes firm, and the trade-offs owners should weigh.
Read guide
An EPC contractor selection fails when a 300 MW test is copied onto the wrong plant, or left blank. The 2017 Rupsha invitation prints 325 million USD and two 300 MW contracts.
Read guide
A construction budget fails when a screening figure is treated as authorization. On a base of 100, the wider Class 5 ends are 50 and 200. The wider Class 3 ends are 80 and 130.
Read guide
Good design-build planning connects scope, approvals, cost, materials, and construction sequence before each choice becomes expensive to change.
Open the planning deskStart with the decision in front of you, then follow the links through cost, delivery, and material consequences.
SEI Design Build turns fragmented information about scope, cost, construction, and materials into practical guidance for owners and project teams.